Tendering NOR outside port limits

Guidance to Masters: what happens to laytime and demurrage when a vessel tenders NOR outside port limits before it has legally “arrived”.

Reading Time: 3 minutes

Guidance to Masters, #4 article in the stop loss series: tendering NOR outside port limits

Duty Officer (MV ABC):

“Port Control, this is Motor Vessel ABC. My ETA to the pilot station is XXX LT. Kindly advise berthing prospects.”

Port Control:

“MV ABC, this is Port Control. Currently, there are no berthing prospects available. Anchorage is heavily congested. Please drift outside port limits. We will inform you when you may proceed in.”

Action Taken: Vessel instructed to drift outside port limits. Position monitoring commenced. Further instructions awaited from Port Control.

 —this scenario is more common than we realize, and many vessels and even chartering teams might accept such port instructions at face value without fully assessing the implications for the Notice of Readiness (NOR) and its validity under the charter party terms.—

 Here’s a breakdown of the issue:

Infographic explaining the "Arrived Ship" trap and legal requirements for tendering Notice of Readiness (NOR) inside and outside port limits to protect demurrage claims.
Understanding the “Arrived Ship” concept: Why tendering NOR outside port limits can jeopardize your demurrage claims and laytime commencement.

 🔍 What’s the Problem?

When Port Control instructs a vessel to drift outside port limits, and the Master complies before tendering NOR (or sometimes even after), this can invalidate the NOR under many charter party forms like ASBATANKVOY, BPVOY4, etc., because:

-Laytime typically starts only when the vessel is within port limits, arrived, and NOR is validly tendered.

-If the vessel is outside port limits, then it’s generally not considered an “arrived ship.”

 ⚠️ Why We Accept It Without Question

-Port control is seen as an authority, and their instructions are followed unquestioningly — especially if the anchorage is congested.

-Operational convenience and routine acceptance often override the awareness of charter party implications.

-Many assume that tendering NOR “close enough” or “soon after” drifting is sufficient — but legally, this can be contested.

 ⚓ How This Affects the NOR and Laytime

-Invalid NOR: If NOR is tendered while drifting outside port limits, it can be rejected by Charterers.

-Laytime delay: If the vessel must re-tender NOR only after anchoring inside port limits, any waiting time before that won’t count as laytime.

-Demurrage risk: Delayed laytime commencement may result in demurrage claims being rejected or reduced.

 ✅ What Should Be Done

-Master Awareness: Ensure Masters understand the legal definition of “arrived ship” and confirm port limits on charts.

-Documentation: If instructed to wait outside port limits, record VHF communications and notify Charterers immediately.

-Enter and Exit port limits: It is quite common to enter the port limits , tender NOR and then exit. Needleless to say this is to be done with port permission.

-Re-Tendering: Once inside port limits, re-tender NOR formally — especially if previously tendered outside.

Key takeaways on NOR outside port limits

  • NOR outside port limits can be rejected. A vessel outside port limits is generally not an “arrived ship”, so a Notice of Readiness tendered there may be rejected by Charterers.
  • Laytime may start late. If NOR has to be re-tendered inside port limits, waiting time before that will not count as laytime, and demurrage claims may be rejected or reduced.
  • Know the definition. Masters should understand the legal meaning of “arrived ship” and confirm port limits on the chart before accepting an instruction to wait.
  • Record and report. If instructed to wait outside port limits, record the VHF communications and notify Charterers immediately.
  • Re-tender formally. Once inside port limits, re-tender NOR, especially if it was first tendered outside.

The article refers to charter party forms such as ASBATANKVOY and BPVOY4, under which this issue can invalidate a NOR. It also raises a wider question that the later pieces in this series return to: if many vessels and charterers accept such instructions at face value, the procedure, not the crew, may be the finding. See Desire paths: when the whole fleet skips the step.

Written by
Capt. Nilesh Kawal

Capt. Nilesh Kawal is a seasoned maritime professional currently serving as Senior Manager – Post Fixture Claims in commercial management with Scorpio. He brings over 17 years of seagoing experience on tanker vessels, followed by a strong shore-based career since 2012 in ship management, training, and commercial operations. His extensive sailing background has given him deep operational insight into tanker operations, safety,…

Views expressed are the author's own and do not represent those of their employer.

LinkedIn profile
Follow Maritime Dossier on LinkedIn to see new entries as they are published.Follow

Leave a Reply

Your email address will not be published. Required fields are marked *